Façade Panel Launch Tables
References: R Record keeping requirement | E An engineering/certification requirement | P A permit to work requirement | S A safe work method statement (SWMS) / written plan
Operational
Where used, façade panel launch tables must comply with AS 4100 –Steel Structures and AS/NZS 1554.1: – Structural Steel Welding Part 1: Welding of Steel Structures.
E Proof load test certificates must be supplied (by façade contractor) to MPX prior to use on site.
Façade panel launch tables must be fitted with the following:
- A compliance plate indicating its maximum capacity.
- A warning sign (sticker / decal) must be fitted to the launch table alerting the operator to check that the props have been properly deployed prior to use
- The castors fitted must be of sufficient rated capacity to withstand loads imposed.
- Façade panel launching tables must be inspected prior to use (castors, pops etc)
Legal and Other Requirements
- Managing Risks of Plant Code of Practice (Qld) 2013
Document Control
Version 1 August 2019 – New Standard