Click here for instructions on How to Print a Web Page

Health and Safety Handbook



The Health and Safety handbook has been developed to set out the minimum health and safety procedures and standards to control risks associated with our operations.

H&S Handbook Updates

Title Change Date Page Change Change
Update 21/02/2024 Risk Management Update to section: Safety in Design Risk Workshops
Update 24/01/2024 Demolition Update to entire page.
Update 03/11/2023 Mobile Elevated Work Platforms Update to entire sections with additional information and images
Update 03/11/023 Scaffolding Update to entire sections with additional information and images
Update 03/11/023 Gantries and Hoardings (incl. gates) Update to page name and entire sections with additional information.
Update 03/11/023 Ground Improvements, Piling, Anchors etc. 'Design and Planning' and 'Ground Improvement Operations' sections updated with additional information
Update 03/11/023 Cantilevered Crane Loading Platforms (CCLP) Updated with additional information in 'Use' section.
Update 03/11/2023 Plant and Equipment Schedule Update to: Hoarding – “A” Class (perimeter fence) incl vehicular gates, ​Hoarding – “B” Class (overhead gantry / structural) incl vehicular gates with additional information. Additional information to new row: Temporary Fence
Update 03/11/2023 Psychosocial Health Additional page and new information added to handbook
Update 26/05/2023 Manual Handling (Hazardous Manual Tasks) Removed the QLD requirement to perform a risk assessment and for the safety in design risk assessment to consider hazardous manual tasks.
Update 24/10/2022 Perimeter Screens Entire section updated with additional information and diagrams.
Update 22/07/2022 Concrete Placement Equipment (Line, Mobile or Satellite Updates to the following: Site logistics and public safety Design, staging and assembly of a satellite placing boom Exclusion zones (e.g., barricading and signage), protective screens, or barriers around the mobile placing booms and concrete line. Cleaning out /blowing out concrete pumping equipment and trucks Training for climbing / sections being added / removed
Update 15/06/2022 Cranes - Tower (TC) Multiplex Crane Induction Part 1 - Crane Use Overview 
Update 15/06/2022 Lifting Equipment (Slings, chains, shackles, bins, stillages, cages etc) Multiplex Crane Induction Part 2 - Lifting Gear & Inspections
Update 15/06/2022 Cranes, Hoists and Other Liftin Equipment - General Multiplex Crane Induction Part 3 - Lifting Techniques & Requirements
Update 09/05/2022 Barricading and Signage ​Inclusion of the specification requirements for windrows
Update 09/05/2022 Mobile Plant Inclusion of level I and level II for FOPS
Update 09/05/2022 Cranes, Hoists and Other Liftin Equipment - General Inclusion of the consideration for risk workshops to be held for other equipment configured as a crane and reference to AS2550.1 for details relating to lift studies/plans.
Update 09/05/2022 Work Boxes/Rescue Cage Inclusion of the requirement for a back up communication system and secondary backup system that will prevent the load from falling
Update 09/05/2022 Penetrations in Floors Inclusion of the requirements for vertical risers which have had the wire mesh removed and service installed
Update 09/05/2022 Emergency Fire and First Aid General Inclusion of the fire extinguishers location requirementsfrom any significant switchboard
Update 09/05/2022 Plant and Equipment Inspection Schedule Update to Frequency for Concrete Pump-line, Concrete Pump-mobile boom & Concrete Pump-tower boom
Update 09/05/2022 Busway ​General amendments incl. requirements for handling and storage and testing
Update 01/03/2022 Tower Cranes Update to Planning SectionUpdate to crane selectionUpdate to Operational and Adverse Weather Conditions 
Update 03/02/2022 ​​Training and Competency Schedule ​CrewSafe competency requirement added for NSW crane operators.
Update 29/10/2021 ​Cranes, Hoists and Lifting - General Inclusion of 'High/Low' lift i.e. where 2 or more loads are slung in a vertical configuration from a crane hook in a single lift are not permitted.
Update 06/09/2021 Chain of Responsibility New Standard Developed
Update 20/08/2021 ​Training and Competency Schedule Familiarisation training added for vacuum lifting equipment
Update 20/08/2021 Plant and Equipment Schedule 3 monthly inspections included for Lifting Equipment – bins, cages, chains, chain block & tackles, kibbles, lifting devices, winches, first aid cage, work boxCompliance plate (attached to lifting equipment) included as a record for for Lifting Equipment – bins, cages, chains, chain block & tackles, kibbles, lifting devices, winches, first aid cage, work box SB or RB HRWL included as license for the inspection of height safety equipment – static lines and anchorage (temporary) Monthly battery test reports added for vacuum lifting equipment 
Update 15/07/2021 Permit to Work ​ Pipework Pressure Testing Permit included for VIC, QLD and NSW
Update 01/07/2021 Pressure Testing Pipework ​Pneumatic integrity testing on MPX projects reduced to 50 kPa. Where a hydrostatic pressure =>2000kPA test is planned authorisation is required to be obtained from MPX Site / Services Manager.
Update 30/06/2021 Cranes Tower ​Inclusion of typical details relating to vertical support details.
Update 30/06/2021 Mobile Elevated Work Platforms ​QLD Scissor-type Mobile Elevated Work Platforms must be fitted with secondary protection devices. NSW/VIC – Scissor-type Mobile Elevated Work Platforms must be fitted with secondary protection devices as of 1st January 2022.
Update 30/06/2021 Scaffolding Access shall be provided to each work level of the scaffold by either an internal ladder or stair, as far as practical the ladder or stair is required to be internal
Update 30/06/2021 Introduction Inclusion of references to ACT and SA
Update 02/06/2021 Vacuum Liftin Devices Minor Amendments to vacuum lifting device requirements
Update 19/05/2021 Multiplex Safety Videos New video on Working Adjacent to Live Edges
Update 09/12/2020 Scaffolding Additional clarification of when a scaffold plan is required along with any changes

Multiplex Safety Videos

Live Edge Work

Safe Lead-Based Paint Management

Jumpform and Screens

Facade Panel Installation

Excavation and Trenching

Precast Crane Lifting

CLT Panels

Hazardous Substances

Respirable Crystalline Silica

Cutting and Coring

Internal Climber Crane Jump

Codes of Conduct

Share by: